Ahmed, S M, Ahmad, R and Saram, D D D (1999) Risk management trends in the Hong Kong construction industry: a comparison of contractors and owners perceptions. Engineering, Construction and Architectural Management, 6(03), 225–34.

Boussabaine, A H, Thomas, R and Elhag, T M S (1999) Modelling cost-flow forecasting for water pipeline projects using neural networks. Engineering, Construction and Architectural Management, 6(03), 213–24.

Dissanayaka, S M and Kumaraswamy, M M (1999) Evaluation of factors affecting time and cost performance in Hong Kong building projects. Engineering, Construction and Architectural Management, 6(03), 287–98.

Gunner, J and Skitmore, M R (1999) Pre-bid building price forecasting accuracy: price intensity theory. Engineering, Construction and Architectural Management, 6(03), 267–75.

  • Type: Journal Article
  • Keywords: accuracy; judgement bias; price forecast; price intensity theory
  • ISBN/ISSN: 0969-9988
  • URL: http://www.blackwell-synergy.com/links/doi/10.1046/j.1365-232x.1999.00116.x/abs
  • Abstract:
    A theory of pre-bid building price forecasting accuracy is proposed, based on the heuristic bias framework and with reference to the common practice of basing building price forecasts on the price per square metre of floor area, termed here as Price Intensity (PI). The main prediction of the theory, that high PI contracts will be underestimated and low PI contracts will be overestimated, is tested by a re-analysis of a set of Singapore data and in comparison with previous work.

Jaafari, A and Manivong, K (1999) The need for life-cycle integration of project processes. Engineering, Construction and Architectural Management, 6(03), 235–55.

Kaka, A P (1999) The development of a benchmark model that uses historical data for monitoring the progress of current construction projects. Engineering, Construction and Architectural Management, 6(03), 256–66.

Kartam, N A (1999) Design/construction integration: issues and illustrative prototype. Engineering, Construction and Architectural Management, 6(03), 299–314.

Khosrowshahi, F (1999) Neural network model for contractors' pre-qualification for local authority projects. Engineering, Construction and Architectural Management, 6(03), 315–28.

Pasquire, C (1999) The implications of environmental issues on UK construction management. Engineering, Construction and Architectural Management, 6(03), 276–86.